| Official title | Specialised construction activities in civil engineering | Demolition and site preparation | Electrical, plumbing and other construction installation activities | Building completion and finishing | Specialised construction activities in construction of buildings |
| Plain-language summary | Use this group for the broader activity area of specialised construction activities in civil engineering, including Specialised construction activities in civil engineering. Open the child codes when a more specific code is needed. | Use this group for demolition and site preparation when the main activity includes Demolition and Site preparation. Check exclusions and nearby codes before applying it to a mixed activity. | Use this group for electrical, plumbing and other construction installation activities when the main activity includes Electrical installation and Plumbing, heat and air-conditioning installation. Check exclusions and nearby codes before applying it to a mixed activity. | Use this group for the broader activity area of building completion and finishing, including Plastering, Joinery installation, and Floor and wall covering. Open the child codes when a more specific code is needed. | Use this group for the broader activity area of specialised construction activities in construction of buildings, including Roofing activities and Other specialised construction activities in construction of buildings. Open the child codes when a more specific code is needed. |
| Official inclusions | Not stated separately in available source data | - - This group includes activities of preparing a site for subsequent construction activities, including the removal of previously existing structures.
| - - This group includes installation activities that support the functioning of a building, including the installation of electrical systems, plumbing (water, gas and sewerage systems), heat and air-conditioning systems, elevators, and so on.
| Not stated separately in available source data | Not stated separately in available source data |
| Official exclusions | Not stated separately in available source data | Not stated separately in available source data | Not stated separately in available source data | Not stated separately in available source data | Not stated separately in available source data |
| Typical examples | - - Specialised construction activities in civil engineering
| - - Demolition
- - Site preparation
- - Test drilling and boring
| - - Electrical installation
- - Plumbing, heat and air-conditioning installation
- - Installation of insulation
- - Other construction installation
| - - Plastering
- - Joinery installation
- - Floor and wall covering
- - Painting and glazing
| - - Roofing activities
- - Other specialised construction activities in construction of buildings
|
| Common reasons to choose this code | - - Specialised construction activities in civil engineering
| - - This group includes activities of preparing a site for subsequent construction activities, including the removal of previously existing structures.
| - - This group includes installation activities that support the functioning of a building, including the installation of electrical systems, plumbing (water, gas and sewerage systems), heat and air-conditioning systems, elevators, and so on.
| - - Plastering
- - Joinery installation
- - Floor and wall covering
- - Painting and glazing
| - - Roofing activities
- - Other specialised construction activities in construction of buildings
|
| Common reasons not to choose this code | - - Activities primarily classified as demolition and site preparation
- - Activities primarily classified as electrical, plumbing and other construction installation activities
- - Activities primarily classified as building completion and finishing
- - Activities primarily classified as specialised construction activities in construction of buildings
| - - Activities primarily classified as electrical, plumbing and other construction installation activities
- - Activities primarily classified as building completion and finishing
- - Activities primarily classified as specialised construction activities in construction of buildings
- - Activities primarily classified as specialised construction activities in civil engineering
| - - Activities primarily classified as demolition and site preparation
- - Activities primarily classified as building completion and finishing
- - Activities primarily classified as specialised construction activities in construction of buildings
- - Activities primarily classified as specialised construction activities in civil engineering
| - - Activities primarily classified as demolition and site preparation
- - Activities primarily classified as electrical, plumbing and other construction installation activities
- - Activities primarily classified as specialised construction activities in construction of buildings
- - Activities primarily classified as specialised construction activities in civil engineering
| - - Activities primarily classified as demolition and site preparation
- - Activities primarily classified as electrical, plumbing and other construction installation activities
- - Activities primarily classified as building completion and finishing
- - Activities primarily classified as specialised construction activities in civil engineering
|
| Usually not this code | - - Activities primarily classified as demolition and site preparation
- - Activities primarily classified as electrical, plumbing and other construction installation activities
- - Activities primarily classified as building completion and finishing
- - Activities primarily classified as specialised construction activities in construction of buildings
| - - Activities primarily classified as electrical, plumbing and other construction installation activities
- - Activities primarily classified as building completion and finishing
- - Activities primarily classified as specialised construction activities in construction of buildings
- - Activities primarily classified as specialised construction activities in civil engineering
| - - Activities primarily classified as demolition and site preparation
- - Activities primarily classified as building completion and finishing
- - Activities primarily classified as specialised construction activities in construction of buildings
- - Activities primarily classified as specialised construction activities in civil engineering
| - - Activities primarily classified as demolition and site preparation
- - Activities primarily classified as electrical, plumbing and other construction installation activities
- - Activities primarily classified as specialised construction activities in construction of buildings
- - Activities primarily classified as specialised construction activities in civil engineering
| - - Activities primarily classified as demolition and site preparation
- - Activities primarily classified as electrical, plumbing and other construction installation activities
- - Activities primarily classified as building completion and finishing
- - Activities primarily classified as specialised construction activities in civil engineering
|
| Related codes | - - 43.1 Demolition and site preparation
- - 43.2 Electrical, plumbing and other construction installation activities
- - 43.3 Building completion and finishing
- - 43.4 Specialised construction activities in construction of buildings
- - 43.50 Specialised construction activities in civil engineering
- - 43 Specialised construction activities
| - - 43.2 Electrical, plumbing and other construction installation activities
- - 43.3 Building completion and finishing
- - 43.4 Specialised construction activities in construction of buildings
- - 43.5 Specialised construction activities in civil engineering
- - 43.11 Demolition
- - 43.12 Site preparation
- - 43.13 Test drilling and boring
- - 43 Specialised construction activities
| - - 43.1 Demolition and site preparation
- - 43.3 Building completion and finishing
- - 43.4 Specialised construction activities in construction of buildings
- - 43.5 Specialised construction activities in civil engineering
- - 43.21 Electrical installation
- - 43.22 Plumbing, heat and air-conditioning installation
- - 43.23 Installation of insulation
- - 43.24 Other construction installation
- - 43 Specialised construction activities
| - - 43.1 Demolition and site preparation
- - 43.2 Electrical, plumbing and other construction installation activities
- - 43.4 Specialised construction activities in construction of buildings
- - 43.5 Specialised construction activities in civil engineering
- - 43.31 Plastering
- - 43.32 Joinery installation
- - 43.33 Floor and wall covering
- - 43.34 Painting and glazing
- - 43 Specialised construction activities
| - - 43.1 Demolition and site preparation
- - 43.2 Electrical, plumbing and other construction installation activities
- - 43.3 Building completion and finishing
- - 43.5 Specialised construction activities in civil engineering
- - 43.41 Roofing activities
- - 43.42 Other specialised construction activities in construction of buildings
- - 43 Specialised construction activities
|
| Parent hierarchy | F CONSTRUCTION > 43 Specialised construction activities > 43.5 Specialised construction activities in civil engineering | F CONSTRUCTION > 43 Specialised construction activities > 43.1 Demolition and site preparation | F CONSTRUCTION > 43 Specialised construction activities > 43.2 Electrical, plumbing and other construction installation activities | F CONSTRUCTION > 43 Specialised construction activities > 43.3 Building completion and finishing | F CONSTRUCTION > 43 Specialised construction activities > 43.4 Specialised construction activities in construction of buildings |
| Rev. 2 mapping | - - 43.9 -> 43.5 (scope-aligned)
- - 42.1 -> 43.5 (scope-aligned)
| | - - 43.3 -> 43.2 (scope-aligned)
- - 43.9 -> 43.2 (scope-aligned)
- - 43.2 -> 43.2 (exact)
| - - 43.9 -> 43.3 (scope-aligned)
- - 43.3 -> 43.3 (exact)
| - - 43.9 -> 43.4 (scope-aligned)
|